Time planning Completed
Location Kuching, Sarawak, Maleisië


The Project

In 2003 we already started the construction of a completely new landfill site in Kuching, Sarawak, Malaysia in line with to European quality standards. Already from the start of the project, the decision was made to use Trisoplast in both the hazardous waste and domestic waste landfills. Since then, almost every year new phases have been set up using Trisoplast.

Several years ago, we even started sealing the top cover of those old sites that had reached final height. Even after various investigations into alternative options for the sealing layer, the client still stayed with Trisoplast.

It is a great result that, despite the slightly more expensive price, the client still chose Trisoplast. This is, according to the client, because of the thin layer in combination with the high level of quality, durability and positive (and fast) installation experiences with the product.

PROJECT IN PICTURES

  • M1
  • M2
  • M3